back arrow
next arrow

Texas Tech University

ESBII Building
Lubbock, TX, USA

Opening in late 2019, the Texas Tech Experimental Science Building represents a continued investment in research among faculty, students, and industry partners. The 117,000 SF building includes vivariums, wet labs, instrumentation labs and synthetic labs. Accutrol contributes to the University’s goal of providing state-of-the-art lab space for researchers conducting chemical and life-science research.

Project Highlights

  • Application for Chemistry and Biology Labs
  • 433 AccuValves
  • AV/AVC Series Low Pressure Drop design AccuValves for major energy savings
  • AccuValve design allowed a decrease in the original fan sizes
  • Lab controls by Schneider, matching the rest of building
  • Quieter system
Texas Tech University ESBII Building

Engineering Firm: Shah Smith (Dallas, TX)
Representative: ThermAir Integrated Technologies